NCTC is awarded a Project R 1000D – Sharjah to Khorfakkan New Road by Sharjah Roads | National Contracting News (2023)


NCTC is awarded a Project R 1000D – Sharjah to Khorfakkan New Road by Sharjah Roads | National Contracting News (2)

NCTC is awarded a Project R 1000D – Sharjah to Khorfakkan New Road by Sharjah Roads and Transport Authority (SRTA).

Sun 24 December 2017

The project site is located from Al Wishah towards Difta.

The Scope of works consists:

-Construction of New Dual Road from Al Wishah towards Difta from Ch. 36+000 to Ch. 47+000 including future Crossing Ducts, Earthworks, Cut & Fill, Crossing Culverts and Street Lighting Network.


NCTC is awarded a Project R 1000D – Sharjah to Khorfakkan New Road by Sharjah Roads | National Contracting News (3)

NCTC is awarded a Project Cont. R 405(j) – Road Leading to Shis Village by Government of Sharjah, Roads & Transport Authority (SRTA).

Tue 26 September 2017

The Scope of works consist:

Construction of Access Road, approximate 3.1 km in Khorfakkan Area, Sharjah.


NCTC is awarded a Project R 1000D – Sharjah to Khorfakkan New Road by Sharjah Roads | National Contracting News (4)

NCTC is awarded a Project Cont. R 1029/1 – Development of Latifa Bint Hamdan Street (Contract 1) by Roads & Transport Authority – Dubai

Wed 08 March 2017

The project is located at the eastern part of Dubai Urban Area. The road corridor is located between Shiekh Zayed Road to the west and Emirates Road to the east running east-west direction with approximate length of 25km. The project has been divided into several contracts this is contract 1 of the project.

The project of work of this contract is to upgrade the existing segment of Latifa Bint Hamdan Street in Al Quoz Area from the intersection of First Al Khail St. till the interchange of Al Khail Road with Latifa Bint Hamdan Street with a total length of approximate 3km.

The Scope of works consists:

•Junction (1) : The existing signalized intersection between Latifa Bint Hamdan Street ( D67) and Al Asayel Street (D72) is proposed as a single point uban Interchange with At Grade Signal and providing first – level bridge along Latifa Bint Hamdan Street ( three lanes in each direction) and a second-level bridge along Al Asayel Street ( Two lanes in each directions).
•Junctions (2) : Maintain the existing cloverleaf interchange at Al Khail Road ( E44) intersection with Latifa Bint Hamdan Street while proposing a left turn ramp from the direction of Latifa Bint Hamdan Street to the CD Road of Al Khail Road in the northbound ( NB) direction.

The work also includes the provision of street lighting services to the proposed roadway facilities, crossing ducts for different utilities and the relocation and/or protection of existing services affected by the proposed highway scheme based on coordination and approval of the respective utility authorities. It also includes the study, design and construction of three pedestrian bridges.


NCTC is awarded a Project R 1000D – Sharjah to Khorfakkan New Road by Sharjah Roads | National Contracting News (5)

NCTC is awarded a Project Cont. 301-501 – Construction of Foul Drainage Networks At Areas Close to the Sea at Kalba City by Government of Sharjah, Directorate of Public Works.

Fri 20 January 2017

The Scope of works consists:

•Construction of Foul Drainage Networks at Areas close to the sea at Kalba, gravity main trunk lines and around 72,920m with Sewer dia. from 160mm up to 1200mm GRP and UPVC Pipes.
•Construction rising main from proposed lifting stations P-A & P-B around 10,000m GRP Pipe to existing STP & proposed STP.
•Construction of lifting station P-A & P-B
•Construction MH’s (1200mm,1500mm,2000mm,2500mm dia.) on proposed sewer networks around 671 nos. and LIC around 1800 nos.
•Reinstatement of Roads and Parkings.


NCTC is awarded a Project R 1000D – Sharjah to Khorfakkan New Road by Sharjah Roads | National Contracting News (6)

NCTC is awarded a Project Al Maktoum International Airport – AMI/250 : AMIA Phase 1 – Construction Logistics Package by Dubai Aviation Engineering Projects Corporation ( “DAEP”)

Wed 16 November 2016

The proposed new expansions at Al Maktoum International Airport (AMI) will have an increase in the number of employees and workers accessing to their work locations inside the Airport. The aim of this project is to facilitate the movement of Contractors’ workers and equipment to Phase 1 construction sites.

The Scope of works consists:

•Package – Temporary Roads
➢Temporary Roads
➢Street Lighting
➢Utilities
•Package – Temporary Fences & Gates
➢Temporary Fences
➢Permanent Fences
➢Gates & Kiosks
•Package – Site Security
➢Site Security Gates
➢Guard House Buildings
➢Bus- Private Car Parking
➢Fences, Street Lighting
➢Drainage and Utilities
•Package – Temporary Utilities
➢MV Substation Buildings
➢Roads around MV Substation Buildings
➢Fences, Street Lighting Utilities
•Packages – Office Buildings
➢DEAP Offices, Consultants Offices ( Around 190,700 sq. meters)


NCTC is awarded a Project R 1000D – Sharjah to Khorfakkan New Road by Sharjah Roads | National Contracting News (7)

NCTC is awarded a Project Cont. R 1052 – Arjan Second Access Road by Government of Dubai, Roads and Transport Authority, Dubai

Thu 20 October 2016

The Scope of works consists:

The Scope of Works for this project comprised of the following:

•Construction of Roads which containing the widening of Shk. Mohammed Bin Zayed Road of 0.60km length exist single access (8m width) towards Shk. Mohammed Bin Zayed Road and 0.45km length of entry access (7m width single carriage way) towards Arjan Development in addition to 3.0m sidewalks on both sides.
•Providing of Guard Rails/Rigid Barriers as part of Road Furniture.
•Relocation of existing (Gantry, Sign Boards, Barriers, Guard Rail and Trees) as part of Road Furniture.
•Protection works for the existing potable eater network, the existing sewerage rising mains and the existing irrigation pipelines.
•Protection works to be provided to the existing Telecom services ( Etisalat & Du)
•Construction of Storm Water drainage system for the proposed road.
•Relocation works for the existing Irrigation pipelines.
•Laying of Electrical Cables & ducts.


NCTC is awarded a Project R 1000D – Sharjah to Khorfakkan New Road by Sharjah Roads | National Contracting News (8)

NCTC is awarded a Project Cont. R 509 – Internal Roads in Um Fneen Area by Government of Sharjah, Roads & Transport Authority.

Fri 07 October 2016

The project site is located in Central Region, Um Fneen Area, Sharjah.

The Scope of works consists:

The Scope of work comprises of the following road works:
•Internal roads consisting of length approx. 7.45km
•Carriageway with Shoulders
•Parking and Foot Path
•Duct Crossings


NCTC is awarded a Project R 1000D – Sharjah to Khorfakkan New Road by Sharjah Roads | National Contracting News (9)

NCTC is awarded a Project Cont. M 64/2015 – Improvement and Upgrading of Maliha Road from Sheikh Khalifa Road (Ph.1 to Al Badee Interchange) by Ministry of Public Works with contract value of Dhs. 174 Million

Sat 28 November 2015

The Scope of works consists primarily, but not by way of limitation of the followings :
➢Construction and maintenance of temporary public traffic and pedestrians passing through or around construction works.
➢The working of borrow pits for the extraction of construction materials, and the restoration of such sites following completion of construction.
➢Construction of diversion road as required and as per specifications.
➢Laying and compaction of subgrade, granular and asphaltic pavement layers for road construction.
➢Installation of Guard rails and repairing of fencing.
➢Protection and relocation of existing utilities wherever required.
➢Extending the existing ducts.
➢Construction of Storm Water Drainage channels and ponds.
➢Protecting, Replacing and Installation of Road Furniture, inclusive of roads signs, and road marking etc.
➢Improvement and Installation of Electrical Cables, Road Lighting Network and Supply and Execution of miscellaneous items and operations ancillary to the main works.


NCTC is awarded a Project R 1000D – Sharjah to Khorfakkan New Road by Sharjah Roads | National Contracting News (10)

NCTC is awarded a Project Cont. R 978/3A – Development of Cycle and Jogging Track at Various Locations in Dubai ( Mirdif, Mushrif, Al Khawaneej & Al Mizhar) by RTA - Dubai

Tue 17 November 2015

The scope of work provides cycle track integration with the roadway system. The project offers opportunity to provide conditions conducive for cyclists.This project is to be phased with the study area being around, Mushrif Park, Mirdif and Al Khawaneej. The overall intent is to improve the attractiveness of the cycle paths/jogging tracks through improved open space design.The contract includes irrigation ducts, irrigation systems, soft landscape and the like. The cycle track works are proposed for the areas along one side of the carriageway within the right of way to the extent of contract limits. The works include hard and soft landscape treatments. Hard landscape works include but are not limited to pedestrian pavements, cycle track, street furnishings, irrigation and edging between all planting areas.


NCTC is awarded a Project R 1000D – Sharjah to Khorfakkan New Road by Sharjah Roads | National Contracting News (11)

NCTC is awarded a Project Cont. R 968 – Mahafiz Al Faya Road by SRTA - Sharjah

Sun 11 October 2015

The scope of work comprises of construction of approximate 14.6 km road (Asphalt Road), Culvert, Earthworks, Pipeworks, Foul Drainage and Services (Electricity, Street Lighting, Surface Water Drainage, Telephone and Water).


NCTC is awarded a Project R 1000D – Sharjah to Khorfakkan New Road by Sharjah Roads | National Contracting News (12)

NCTC is awarded a Project R 959 – Development of Ahmed Bin Abdul Rahman Bin Hadid Square

Sun 27 September 2015

The scope of work comprises of replacing the existing roundabout with a signalized junction, parallel parking with buffer lane in front of the residential units surrounding this junction, traffic management works and associated services works.


NCTC is awarded a Project R 1000D – Sharjah to Khorfakkan New Road by Sharjah Roads | National Contracting News (13)

NCTC is awarded a Project R 931/3 – Leveling and Roads in Oud Al Muteena 2 by RTA - Dubai

Sun 20 September 2015

The scope of work comprises of construction of approximate 18 km of internal roads and on street parking, reconstruction of access to villas as required, adjustment of cover levels of drainage, providing curb gullies and curb on either sides, manholes, protection relocation of services and providing street lighting.


NCTC is awarded a Project R 1000D – Sharjah to Khorfakkan New Road by Sharjah Roads | National Contracting News (14)

NCTC was awarded a Project AUH.06.13.0501-T1-T3 Landside Road Network Construction by Abu Dhabi Airport Authority

Sat 12 September 2015

The scope of work comprised of storm drainage network pipes, irrigation pipeline, relocating existing lighting poles, lighting cables, medium voltage cables and electrical boards. The project also includes furnishing and installing 4 nos. 160mm duct banks (including the conduits), 95mm 2 counterpoise wires, concreting, excavating, filling and installing of GHQ and ATC manhole.


NCTC is awarded a Project R 1000D – Sharjah to Khorfakkan New Road by Sharjah Roads | National Contracting News (15)

NCTC was awarded a Project Improvement of Intersection of Umm Al Quwain Falaj Al Mualla Road ( E55)

Sun 14 June 2015

The scope of work comprised of 4 leg elliptical Round, lighting, traffic signs, road markings, safety barriers, relocating of existing utilities such as Water, Electricity, Etisalat, Du, Military fiber optic cable, Irrigation, gas and construction of the new services line as per specification and standards. Protection of existing utilities, Irrigation Works, Military Fiber Optic Cable Works and Gas Pipeline Works was also included in the project.


NCTC is awarded a Project R 1000D – Sharjah to Khorfakkan New Road by Sharjah Roads | National Contracting News (16)

NCTC was awarded a Project R 801/1 – Roads in Al Barsha South 1 & 2

Sun 14 June 2015

The scope of work was comprised of construction of Roads in Al Barsha 1 and 2, removals of trees, clearing of the site, ducts and drainage works. Diversion of DEWA power line was also included in the work. The total length of roads constructed reach to approximately 59.3 km consisting of 10.82 km collector roads and 48.37 km of major and minor access roads. Project also includes the construction of roadway signage, pavement marking, street lighting, traffic signals, intersections with existing roads and minor storm water drainage system.


NCTC is awarded a Project R 1000D – Sharjah to Khorfakkan New Road by Sharjah Roads | National Contracting News (17)

NCTC was awarded a Project Abu Dhabi International Airport South Airfield Development

Wed 01 May 2013

The scope of work was comprised of complete rehabilitation of South Runway 13R-31L, new taxiways in between threshold 13R, new Airfield Ground Lighting system which will be connected to the existing AGL Infrastructure and substations where new CCR’s will be installed as required. A complete runway strip up to 160m from the centerline of the runway in both north and south directions was re-graded and provided with a surface protection layer. They made also new drainage line located within the northern strip, east of existing cross taxiways G and H and new drainage system within the runway. Replacement of new cabling, transformer, addressable control units and CCR’s applicable to the existing AGL substation was also included in the scope of work for the above project.


NCTC is awarded a Project R 1000D – Sharjah to Khorfakkan New Road by Sharjah Roads | National Contracting News (18)

NCTC was awarded a Project Sharjah International Airport New Runway at 250m Separation Civil Works

Wed 01 August 2012

The scope of work was comprised of drainage works, earthworks, pavement marking, surface protection to the runway strip, communication network installation and construction of Two Sub-Station buildings. Main and Standby power systems includes internal 11kv power distribution equipment, power factor correction equipment, standby generators, bulk fuel storage and distribution systems, uninterruptible power system, LV power distribution equipment, system earthing and lighting protection installations.By October of 2014, the runway was opened for Public use. Private Plane of His Highness Sultan Bin Muhammad Al Qasimi, Sharjah Ruler, was the first who take off and landed.

Related News

  • Sat 28 November 2015NCTC is awarded a Project Cont. M 64/2015 – Improvement and Upgrading of Maliha Road from Sheikh Khalifa Road (Ph.1 to Al Badee Interchange) by Ministry of Public Works with contract value of Dhs. 174 Million
  • Wed 16 November 2016NCTC is awarded a Project Al Maktoum International Airport – AMI/250 : AMIA Phase 1 – Construction Logistics Package by Dubai Aviation Engineering Projects Corporation ( “DAEP”)
Top Articles
Latest Posts
Article information

Author: Sen. Ignacio Ratke

Last Updated: 26/08/2023

Views: 5748

Rating: 4.6 / 5 (76 voted)

Reviews: 91% of readers found this page helpful

Author information

Name: Sen. Ignacio Ratke

Birthday: 1999-05-27

Address: Apt. 171 8116 Bailey Via, Roberthaven, GA 58289

Phone: +2585395768220

Job: Lead Liaison

Hobby: Lockpicking, LARPing, Lego building, Lapidary, Macrame, Book restoration, Bodybuilding

Introduction: My name is Sen. Ignacio Ratke, I am a adventurous, zealous, outstanding, agreeable, precious, excited, gifted person who loves writing and wants to share my knowledge and understanding with you.